AMDC Retrofit

Project overview

Hawthorn, 3122, Victoria

Reimagining AMDC as space to stay beyond class time, this retrofit connects student levels through a shared signature staircase. Curved elements are carried from the interior to the facade that forms ramps connecting new and existing outdoor spaces enhancing student connection and collaboration.

Details

AMDC Retrofit - ARC30004 - Professional Practice 1: BIM

I analysed both façade options developed from prior iterations and selected Option 1 as the stronger design for the project.
Carried the curved element of the facade and interior staircase into our furniture selection, creating these custom families.

In Depth

The Advanced Manufacturing & Design Centre (AMDC) on Swinburne University of Technology's Hawthorn campus is meant to be a place where students and teachers can collaborate outside of class. The ability to do this is hindered through the existing design of levels 5-8.

Our Retrofit addressed awkwardly placed storage rooms and kitchens, tight classroom spill out zones, lack of open collaborative and outdoor spaces and a lack of connection between student floors and teacher floors.

To tackle these issues we included outdoor spaces, outdoor ramps that wrap the northern facade, and two signature staircases connecting level 5 & 6, and level 7 & 8, encouraging peer collaboration with the intention of elevating the university experience at AMDC.

Our group excelled during the project through strong model and project management, keeping our communication clear and workflow coordinated throughout the design process.

Additional Views, Plans + Physical Model

Kyriakos Gelis

Melbourne, Victoria, Australia | (+61) 413 390 762 | k.gelis@icloud.com

© Kyriakos Gelis, 2026